Now showing items 1-15 of 15

  • Analysis of gender differences in education for engineering career (Gaborone case study) 

    Nair, S.; Vokolkova, V.; Abadjieva, T.; Michalek, J. (University of Botswana, 2000)
    The percentage of students, especially women in engineering, is very low in Botswana and the country is still heavily dependent upon foreign human resources.The objective of this research has been to study the gender ...
  • Changing gender contracts in self-help housing construction in Botswana: the case of Lobatse 

    Kalabamu, F. (Elsevier http://www. doi:10.1016/j.habitatint.2003.09.005, 2005)
    The purpose of this essay is to identify gender contracts in self-help housing construction. Gender contracts have been defined as invisible power relationships that determine roles, responsibilities, privileges, status, ...
  • Community participation in facility management 

    Ngowi, A.B.; Mselle, P.C. (MCB University Press http://www.emeraldinsight.com/10.1108/02632779810233511, 1998-11)
    By involving the beneficiaries of a facility such as housing or an irrigation scheme, at the various stages of the project, it is possible to build their capacity in relation to the facility, which may contribute to the ...
  • Competition aspect of construction alliances 

    Ngowi, A.B. (MCB University Press. http//:www.emerald.library.com/ft, 2001)
    The primary purpose of forming alliance in the construction industry is to pool together the resources of the participating partners in order to form a team that has a competitive advantage. Each partner in an alliance has ...
  • The construction industry in Botswana: a socio-economic development perspective 

    Ssegawa, J.K. (University of Botswana http://www.ub.bw, 1999)
    By the turn of the century,Botswana will be 34 years old as an independent nation. Reflecting on the past, is a background of tremedous achievements from a socio-economic development perspective.The achievement could not ...
  • The construction industry in Botswana: a socio-economic development perspective 

    Ssegawa, J.K. (University of Botswana, http://www.ub.bw, 1999)
    By the turn of the century, Botswana will be 34 years old as an independent nation. Reflecting on the past, is a background of tremendous achievements from a socio-economic development perspective. The achievements could ...
  • The development of apprentices in the construction industry: a Botswana case study 

    Mwewa, W.L. (University of Botswana, www.ub.bw, 1999)
    The demand for adequate training of artisans and apprentices in the construction industry cannot be over emphasized in view of the rapid changes the industry is undergoing. Many of of these changes are continously taking ...
  • Exploring the possibility of using earned value analysis during the construction phase of a building project 

    Ssegawa, J.K.; Masambaji, C.N. (Faculty of Engineering and Technology, University of Botswana, www.ub.bw, 2011-04)
    To deliver project effectively is of paramount importance because most of the world population depend on services delivered by projects. Reports from various countries around the world, including Botswana, still indicate ...
  • Impact of culture on the application of TQM in the construction industry in Botswana 

    Ngowi, A.B. (MCB University Press, http://www.emerald-library.com, 2000)
    Total quality management (TQM) as an integrated approach to management that represents a holistic management philosophy, rather than a series of techniques, is embedded with cultural values and assumptions that are ...
  • Impact of culture on the application of TQM in the construction industry in Botswana 

    Ngowi, A.B. (MCB University Press; Emerald Publishing Group Ltd; http://www.mcbup.com/research_registers/quality.asp, 2000)
    Total quality management (TQM) as an integrated approach to management that represents a holistic management philosophy, rather than a series of techniques, is embedded with cultural values and assumptions that are consistent ...
  • An investigation into the possibility of establishing a building index for Botswana 

    Ssegawa, J.K.; Samman, J.; Kgatlegang, J. (University of Botswana, 2001)
    Without cost information, project planning is difficult for clients just as pricing of tenders is difficult for construction firms. No agency or organization in Botswana has endeavoured to collect, compile and analyze ...
  • Low flush water closets in buildings and their effects in the drainage systems 

    Ganesan, C.T. (University of Botswana, 1999)
    Water scarcity in arid and semi-arid countries such as Botswana; call for judicious planning and economic use. In this connection many water saving components and appliances have been devised. One such system for example ...
  • Solar still for rose water production 

    Ganesan, C.T. (University of Botswana, 1998)
    This paper is the outcome of students'project work guided by the author. An attempt has been made to design and develop a solar still for rose water production in India. This unit has the following features:i) possibility ...
  • Solar still for rose water production 

    Ganesan, C.T. (University of Botswana, http://www.ub.bw, 1998)
    This paper is the outcome of students'project guided by the author. An attempt has been made to design and develop a solar still for rose production in India. This unit has the following features:i) possibility of tilt ...
  • Tracing the African project failure syndrome: the significance of 'ubuntu". 

    Rwelamila, P. D.; Talukhaba, A .A.; Ngowi, A.B. (Emerald http://www.emeraldinsight.com, 1999)
    The lack of 'ubuntu'(African group solidarity) between project stakeholders in the Southern Africa Development Community (SADC) public building sector has been surrounded by controversy and strongly held opinions. The work ...