Show simple item record

dc.contributor.authorNtshwene, K.
dc.contributor.authorKashiwagi, J.
dc.contributor.authorKashiwagi, D.
dc.date.accessioned2010-02-24T13:58:40Z
dc.date.available2010-02-24T13:58:40Z
dc.date.issued2009
dc.identifier.citationNtshwene, K. et al (2009) The new role of the construction manager/client engineer/quantity surveyor, RICS COBRA Research Conference, University of Cape Town, 10-11th September 2009en_US
dc.identifier.urihttp://hdl.handle.net/10311/473
dc.description.abstractThe traditional contracting/delivery system in Botswana, introduced by the US, UK, and European educators, consultants, and practitioners, has not been working well in Botswana. The poor project delivery system results have forced the organization of a new group, the Government Implementation Coordination Group (GICO) to attempt to solve the problems. In the fall of 2008, the University of Botswana (UB), through the US State Department sponsored Fulbright program, brought professor Kashiwagi, and the best value Performance Information Procurement System (PIPS) technology, the Information Measurement Theory (IMT), and the Industry Structure Analysis to the UB project management section. This paper proposes that the client’s professional representative requires a new, more effective role. The role includes using performance information, transforming the client’s expectations into a design/construction intent by using expert vendors, ensuring the vendors manage and minimize the risk that they do not control, outsourcing the technical responsibilities, and doing quality assurance instead of quality control. This paradigm will minimize project risk, maximize project value, and increase the professionalism of project management, construction management, and quantity surveyors. These concepts will be tested on three test projects in Botswana.en_US
dc.language.isoenen_US
dc.publisherRoyal Institute of Chartered Surveyors http://www.rics.org/site/download_feed.aspx?fileID=5042&fileExtension=PDFen_US
dc.subjectnew quantity surveyor roleen_US
dc.subjectnew paradigm for construction managementen_US
dc.titleThe new role of the construction manager/client engineer/quantity surveyoren_US
dc.typePublished Articleen_US


Files in this item

Thumbnail

This item appears in the following Collection(s)

Show simple item record