Search
Now showing items 1-5 of 5
Solar chimney power generation project - The case for Botswana
(Elsevier Science Ltd. www.elsevier.com/locate/rser, 2007)
Import of a huge proportion of electrical energy from the Southern African Power Pool, and the
geographical location and population distribution of Botswana stimulated the need to consider
renewable energy as an alternative ...
Botswana’s environmental policy on recycling
(www.elsevier.com/locate/resconrec, 2005)
Recycling operations have become one of the primary strategies forwaste management,worldwide.
Especially, recycling operations are viewed as among the most effective techniques for reducing the
amount of municipal solid ...
Solar home systems in Botswana—Opportunities and constraints
(Elsevier Science Ltd. http://www.elsevier.com/locate/rser, 2009)
Lack of access to electricity grid form the main challenge facing majority of developing regions
particularly in rural communities. The situation is driven mostly by the absence of electricity
infrastructure in most of ...
The level of recycling operations in Botswana
(University of Botswana, www.ub.bw, 2004)
This paper describes a case study that evaluated the level of recycling operations in Botswana. Recycling operations are now recommended as effective waste management strategies for reducing the amount of municipal solid ...
Lessons and challenges encountered in the implementation of solar energy – the case of Botswana
(Bentham Open http://www.bentham-open.org, 2009-01-01)
A number of photovoltaic pilot projects have been started in Botswana since 1990. The first photovoltaic project was Manyana PV project which started in 1992. The Japanese International Cooperation Agency (JICA) PV solar ...